Goods of turnover

We move everything

hall storage

we keep the overview and store according to the highest standards

drucken

Approved measurements on the Datteln-Hamm-channel

The measurements approved for the channel do not allow oncoming traffic in single sections. Therefore, one-way traffic was introduced in 1997, first only for approx. 18.6km, now after its expansion for only 7km.

These one-way sections are now passed by the shippers in turns of one hour for upstream navigation (direction Hamm) and downstream navigation (direction Datteln).

For vessels, not having reached their final destination, we provide additional landing stages, which have to be reached before changing direction again. This obstruction will be fully abolished after the completion of the expansion.

from km 0.06 (Dortmund-Ems-Kanal) to km 11.20 (Stumm-Hafen)

  length/mtrs width/mtrs loading depth/mtrs
Vehicle 135,00 11,45 2,80
Pusher unit 186,00 11,45 2,80

from km 11.20 (Stumm-Hafen) to km 35.87

  length/mtrs width/mtrs loading depth/mtrs
Vehicle 135,00 11,45 2,70
Pusher unit 186,50 11,45 2,70

from km 35.87 to km 47.20

  length/mtrs width/mtrs loading depth/mtrs
Vehicle 86,00 9,65 2,50
Pusher unit 86,00 9,65 2,50
deutsche Version
Kontakt